Deliverable 3 associated documents

Deliverable 3 associated documents

The third project deliverable comprises four workstreams: the functional specification for architecture and trial design workstreams were led by Schneider Electric (SE); the functional specification for voltage control methodology workstream was led by Smarter Grid Solutions (SGS); and the detailed site design workstream was led by Fundamentals Ltd.