Small scale generation

Small scale generation

If you are planning to connect new generators to our network, you need to inform us or make an application, so that we can continue to manage and maintain our local electricity network. 

Single premises generation connection

If you are installing a generator at a single premises, it is unlikely that we'll need to carry out work on the network to facilitate your connection.

Please notify us by completing our G83 installation commissioning form and return by email or post.

Our notification form is designed for installations up to a maximum 16 amps per phase.

Where your generation installation includes an inverter, the rating of the installation is assumed to be the inverter's continuous steady state rating.

Multiple premises generation connections

If you are installing generation at multiple premises, we may need to carry out work on the network to facilitate your connection.
Please download our G83 application form and return via email or post.

For more information please read the Energy Networks Association summary guide for G83/2 connections guide.

SSEG Application for connection of multiple G83/2 installations

Are you connecting at a single premises? If so you only need to notify us. Are you connecting at multiple premises? Get started with your application now.

Apply here