Small scale connection generation and storage

Small scale connection, generation and storage

If you are planning to connect new generators and/or storage to our network, you need to inform us or make an application, so that we can continue to manage and maintain our local electricity network. 

View our flowchart for fast track connection of small scale generation and storage.

 

Please be aware that from the 27th April 2019, EREC G98 will be applicable to all small scale generation applications. Further information is available from the ENA website.

 

If your generator was installed after 27April 2019 please complete the applicable G98 forms, which are available here. You will need to complete Form A for Multiple Installations and Form B for single connections.

 

Single premises generation and/or storage connection

If you are installing a generator and/or storage at a single premises, it is unlikely that we'll need to carry out work on the network to facilitate your connection.

Please notify us by completing our G83 application for connection of a single premise form below and return by email or post.

Our notification form is designed for installations up to a maximum 16 amps per phase.

Where your generation installation includes an inverter, the rating of the installation is assumed to be the inverter's continuous steady state rating.

 

Multiple premises generation and/or storage connections

If you are installing generation at multiple premises, we may need to carry out work on the network to facilitate your connection.
Please download our G83 application for connection of multiple premises form below and return via email or post.

For more information please read the Energy Networks Association summary guide for G83/2 connections guide.

SSEG application for connection of a single G83/2 installation

Are you connecting at a single premises? Get started with your application now.

Apply now

SSEG application for connection of multiple G83/2 installations

SSEG application for connection of multiple G83/2 installations.