Micro-Generation connection and installation

Micro-Generation connection and installation

If you are planning to connect new generators and/or storage to our network, you need to inform us or make an application, so that we can continue to manage and maintain our local electricity network. 

 

Please be aware that if your generation was installed before the 27th April 2019, EREC G83 will be applicable. These forms are available on the ENA website.

  

 

Single premises generation and/or storage connection

 

If you are installing a generator and/or storage at a single premises, it is unlikely that we'll need to carry out work on the network to facilitate your connection.

Please notify us by completing a G98 form B application for connection of a single premise form below and return by email or post.

Our notification form is designed for installations up to a maximum 16 amps per phase.

Where your generation installation includes an inverter, the rating of the installation is assumed to be the inverter's continuous steady state rating.

 

Multiple premises generation and/or storage connections

 

If you are installing generation at multiple premises, we may need to carry out work on the network to facilitate your connection.
Please complete a G98 form A application for connection of multiple premises below and return via email or post.

For more information please read the Energy Networks Association G98 connection guide.

G98 Application for single and multiple micro generation installations

Are you connecting a single or multiple micro generation installation? Get started with your application now.

Read More

Get in touch

Submit an SSEG G83/2 application or get help on making an application.

Email us